Revolt With a simple installation on your existing air conditioner or refrigerator’s indoor unit You can significantly Power reduction consumptions

Start Saving from the Moment It’s Attached! While maintaining room temperature, it shortens compressor operation time and minimizes power consumption.

Revolt Main Features

Prevent overcooling and overheating in refrigeration, AC, and heating. Optimal control and operation of compressors

Why Revolt can achieve amazing energy savings.

Functions as an intelligent thermostat with AI capabilities  Three sensors monitor refrigerant pressure to reduce unnecessary compressor operation A low-impact control system that requires minimal installation and maintenance, and does not  affect the air conditioner’s lifespan or operation.

Case Study: Implementation in a Large Suburban Bookstore

Compared to conventional air conditioner operation Up to 38.7% reduction With three sensors (inlet, outlet, and heat exchanger), the system achieves precise temperature control. Combined with refrigerant pressure management—calculated based on temperature fluctuation trends—this patented technology optimizes compressor operation to enhance energy efficiency.
Test conditions at the time of introduction
Current Value Comparison
Cumulative value comparison

Revolt Installation image

The number of units required may vary depending on the facility’s air conditioning and refrigeration (freezing) setup, as well as the specific equipment in use.
In the case of restaurants (e.g., air conditioners) Outdoor unit 1 unit Indoor unit 2 units Revolt 1 unit
Electricity cost before Revolt installation 30,000~40,000 yen/month Electricity cost after Revolt installation 18,000~30,000 yen/month
Significantly shortens the payback period Projected cost savings 10,000~12,000 yen/month
In the case of factories and warehouses(e.g., multi-split air conditioning systems) Outdoor unit 1 unit Indoor unit N units Revolt N unit
Estimated cost savings from Revolt installation Amazingly fast return on investment! Projected cost savings Monthly electricity cost ×30%
Process from Application to Installation A preliminary estimate will be provided within one week. Installation will be completed within one month after the on-site inspection.